Digital Twin™

The living operational model of your plant · Bangkok Plant 1

1. See it before it fails

AI predicts ~3 days ahead

2. Click & assign

Pick the machine in 3D, dispatch a tech

3. Work Order raised

Parts staged, fixed in a planned window

Scrub back to see how last night unfolded before the critical alert
Initializing digital twin…
HealthyWarningCritical
drag to rotate · scroll to zoom

Selected asset

Chiller B

water-cooled chiller

Facility & Utility · Cooling
Critical

Health

58/100

OEE

61%

Power

156kW

Vibration

5.8mm/s

Temp

74°C

CO₂

62kg/h

Burn now

฿485/hr

Predicted failure in ~3 days — AI recommends a work order now.
N

Overseen by

Nid

Refrigeration & HVAC 087-664-2201

Assign maintenance

plan

Condenser fouling. +15% energy draw, peak-demand risk in 3 days.

Factory floor · 20 assets