15-min demand at 97% of the 1,500 kW contract — close the window under 1,500 to avoid the penalty
demand ≥ 95% of contractPower factor on phase L2 at 0.83 — below the 0.85 utility penalty threshold
PF < 0.85Current power
1,255kW
Cost · today
—
Rate · now
4.19฿/kWh
Carbon · now
555kg/h
Live Load Profile
Live draw vs the contract limit
Demand
What the demand charge is billed on
1,420
kW · current 15-min window
Billing demand · month peak
1,455 kW · Jun 24 · 13:42
demand charge
THB 172,300
Instantaneous
1,455 kW
Window closes in
--:--
To month peak
35 kW
Contract headroom
80 kW
Averaging above target — shed or shift load before it sets a new month peak
Single Line Diagram
Live power & ฿ flow through the boards
Inside this cabinet · 3 machines
Open in AssetIQCNC Cell 01
78 kW5-axis machining center
CNC Cell 05
64 kW3-axis machining center
Palletizer 02
42 kW6-axis robotic cell
Idle now
4 machines · 18 kW · ~฿75/h
Top 5 Consumers
Who's drawing the most right now
Live ranking — bars move with the actual load · click a row to drill down
Power Factor
PF vs the 0.85 penalty line
0.96
plant average · now
L1
0.97
L2
0.83
L3
0.96
L2 at 0.83 — below the 0.85 threshold. If it drags the monthly plant PF under 0.85, the kVAR penalty is ≈ ฿3,600/mo. Fix point: DB-CA capacitor bank.
Analyze in Power Quality