EnergyAI™

Energy intelligence · every kilowatt accounted for · Powered by SpareX

15-min demand at 97% of the 1,500 kW contract — close the window under 1,500 to avoid the penalty

demand ≥ 95% of contract

Power factor on phase L2 at 0.83 — below the 0.85 utility penalty threshold

PF < 0.85

Current power

LIVE

1,255kW

Cost · today

Rate · now

On-peak

4.19฿/kWh

Carbon · now

1.5%

555kg/h

Live Load Profile

Live draw vs the contract limit

On-peak 09:00–22:00
Connecting to meters…

Demand

What the demand charge is billed on

LIVE

1,420

kW · current 15-min window

Billing demand · month peak

1,455 kW · Jun 24 · 13:42

demand charge

THB 172,300

0target 1,400peak 1,455contract 1,500

Instantaneous

1,455 kW

Window closes in

--:--

To month peak

35 kW

Contract headroom

80 kW

Averaging above target — shed or shift load before it sets a new month peak

Single Line Diagram

Live power & ฿ flow through the boards

LIVE
Colour: DB-A · Line ATotal draw 1,255 kW
PEA · 24 kVutility gridTR-1 · 1.6 MVA24 kV → 416 V1,255 kWACB 2000 A · 416 VMDB-1Main Distribution BoardBUS184 kWDB-A · Line ACNC · Palletizer197 kWDB-B · Line BPress · Weld · QC206 kWDB-C · Line CIMM · Paint · AMR363 kWDB-COOL · CoolingChillers · CT · Pump206 kWDB-CA · Compressed AirAir Station99 kWDB-FAC · FacilitiesSteam · HVAC · Env
DB-A · Line ALoad 184 kWCurrent 277 APF 0.96Share 15%click a cabinet to inspect

Inside this cabinet · 3 machines

Open in AssetIQ

CNC Cell 01

78 kW

5-axis machining center

94%

CNC Cell 05

64 kW

3-axis machining center

92%

Palletizer 02

42 kW

6-axis robotic cell

89%

Idle now

4 machines · 18 kW · ~฿75/h

CNC-0422m
CNC-0717m
Press-029m
Injection-0341m
Conveyor-A6m
Welder-0528m

Top 5 Consumers

Who's drawing the most right now

LIVE
LIVE moves with live load
1Chiller B156 kW
2Chiller A138 kW
3Stamping Press 03132 kW
4Air Compressor 10110 kW
5Air Compressor 1196 kW

Live ranking — bars move with the actual load · click a row to drill down

Power Factor

PF vs the 0.85 penalty line

LIVE

0.96

plant average · now

0.70penalty below 0.851.00

L1

0.97

L2

0.83

L3

0.96

L2 at 0.83 — below the 0.85 threshold. If it drags the monthly plant PF under 0.85, the kVAR penalty is ≈ ฿3,600/mo. Fix point: DB-CA capacitor bank.

Analyze in Power Quality