PeakShield AI™

Predict and prevent demand peaks

Module 03 · Predict and prevent demand peaks

PeakShield AI™

Forecasts peak demand before it happens and automatically sheds or shifts load to dodge demand-charge penalties.

฿4.5M

penalties avoided / yr

Contract Demand

3,000kW

Predicted Peak

High risk

3,120kW

Headroom

Shedding

-120kW

Penalties Avoided

+฿180K mo

฿4.5M/yr

Automated Load Shedding

Auto-Pilot ON

AI is delaying the startup of Chiller #3 and Air Comp #2 by 15 minutes to stay below the 3,000 kW peak limit. Projected demand-charge saving: ฿180,000 this month.

Peak demand · 6-mo history + 3-mo AI forecast

limit 3,000 kW
Actual AI forecast

Top peak contributors

kW at coincident peak

Chiller B156
Air Comp #2110
Stamping Press 03132
Injection Mold 0888
Weld Robot 0456

Peak forecasting

ML predicts coincident peaks 30+ min ahead from load shape and schedule.

Load shifting

Non-critical loads auto-shift to off-peak windows with zero operator effort.

Demand-charge guard

Hard ceiling enforcement prevents costly contract-demand breaches.